We have conducted the works in Delhaize Serbia distribution center on more than 70 000m2. The facility was completed within the deadline of 14 months respecting all procedures and regulations.Within this project the roofing, drywall and flooring were done. Modern materials produced by attested manufacturers were used and AB prefabricated elements were used in the construction. Building façade was made from thermo-insulating pannels and roof cover is of PVC membrane with associated thermal isolation.